【On-Site Testing】Large Diameter Metal Hose Hydraulic Pressure Testing Site

TESTING CENTER VIEWS

Current position: Home > NEWS > TESTING CENTER > text

【On-Site Testing】Large Diameter Metal Hose Hydraulic Pressure Testing Site

source:Songjiang Group    date:2024-3-27   

Shanghai Songjiang Vibration Absorber Co., Ltd. official website presents to you: 【On-Site Testing】Information about the hydraulic pressure testing site for large diameter metal hoses. Every unit of metal hose products produced by Songjiang Group undergoes testing before leaving the factory. Below is the on-site testing using hydraulic pressure for large diameter hoses, reaching a pressure of 2.4 MPa.

【On-Site Testing】Large Diameter Metal Hose Hydraulic Pressure Testing Site

【On-Site Testing】Large Diameter Metal Hose Hydraulic Pressure Testing Site

Hydraulic Testing Introduction:

Hydraulic testing is a type of permeability test conducted within a borehole. It involves isolating a certain length of the borehole with a plug and then pressurizing water into that borehole segment at a certain pressure, measuring the corresponding inflow rate. The inflow rate per unit length of the test section under a certain pressure is used to characterize the permeability of the rock in that borehole segment, making it a commonly used method for evaluating rock permeability. Pre-test Stage: Gradually raise the water pressure inside the pipeline to the specified test pressure and stabilize it for 30 minutes. If there is a pressure drop during this period, water can be added to re-pressurize, but the re-pressurization must not exceed the test pressure. Inspect the pipeline joints, fittings, and other areas for leaks or damage. If there are leaks or damage, stop the pressure test immediately, identify the cause, and take appropriate measures before retesting. Main Test Stage: Stop adding water and pressurizing, stabilize for 15 minutes. If the pressure drop after 15 minutes does not exceed the allowable pressure drop value, increase the test pressure to the working pressure and maintain it at a constant pressure for 30 minutes. Conduct visual inspection, and if there are no signs of leakage, the hydraulic test is deemed satisfactory.

Previous article:Warm Welcome to CGN and Daya Bay Nuclear Power Plant Leadership for Guidance
Next article:Free Testing Service: Stainless Steel Metal Hose Spectrometer
分享到:

Recommended articles

  • German KSB Water Pump Rubber Expansion Joints
  • Preparing to package rubber flexible joints for export to the OKI Paper Mill project in Indonesia.
  • Regular Hydraulic Testing of Rubber Expansion Joints is Part of Our Workflow
  • Counterfeit Shanghai Songjiang Group substandard vibration Isolators products discovered in Aoyuan project in Yingde City, Guangdong Province
  • Spectrometer Testing Conducted on Metal Expansion Joint Samples Exported to Jeddah Port, Saudi Arabia
  • 【Ingredients】Rubber granule automatic batching system put into operation
  • Customizing EPDM rubber flange gaskets to increase the length of the rubber expansion joint
  • 【Certificate Replacement】Occupational Health Management System Certification for High-Quality Rubber Expansion Joint Factory

Recommended products

  • 【EPDM】DN100 Single Sphere Stainless Steel Flanged Rubber Expansion Joint

    【EPDM】DN100 Single Sphere Stainless Steel Flanged Rubber Expansion Joint

  • HTA-150-C Suspended Fan Spring Vibration Isolators

    HTA-150-C Suspended Fan Spring Vibration Isolators

  • DN200 Fire Protection System Metal Flexible Joint

    DN200 Fire Protection System Metal Flexible Joint

  • DN250 High-Temperature Resistant Rubber Expansion Joint for ‘Direct Heating’

    DN250 High-Temperature Resistant Rubber Expansion Joint for ‘Direct Heating’

Recommended cases

  • Taizhou Municipal Solid Waste Incineration Power Generation Project” Flexible Rubber Expansion Joint Contract

    Taizhou Municipal Solid Waste Incineration Power Generation Project” Flexible Rubber Expansion Joint Contract

  • [Liaocheng Yanju Circulating Water Cooling Tower] Rubber Joint Contract

    [Liaocheng Yanju Circulating Water Cooling Tower] Rubber Joint Contract

  • “Johnson & Johnson Suzhou Medical Equipment Expansion Project” Rubber Expansion Joint Contract

    “Johnson & Johnson Suzhou Medical Equipment Expansion Project” Rubber Expansion Joint Contract

  • Contract for Spring Vibration Absorbers for Jingmen Yiwei Chuangneng Lithium Battery BBC Project

    Contract for Spring Vibration Absorbers for Jingmen Yiwei Chuangneng Lithium Battery BBC Project

  • CONTACT
  • HOME
  • CASES
  • EXPANSION JOINT
  • EXPANSION BELLOW
  • VIBRATION ISOLATOR
  • Website registration number:    Your trustworthy partner - Shanghai Songjiang Vibration Absorber Co., Ltd  Copyright     |  Website Map

    • by telephone
    • Customer service WeChat
    • contact information