【On-Site Testing】Large Diameter Metal Hose Hydraulic Pressure Testing Site

TESTING CENTER VIEWS

Current position: Home > NEWS > TESTING CENTER > text

【On-Site Testing】Large Diameter Metal Hose Hydraulic Pressure Testing Site

source:Songjiang Group    date:2024-3-27   

Shanghai Songjiang Vibration Absorber Co., Ltd. official website presents to you: 【On-Site Testing】Information about the hydraulic pressure testing site for large diameter metal hoses. Every unit of metal hose products produced by Songjiang Group undergoes testing before leaving the factory. Below is the on-site testing using hydraulic pressure for large diameter hoses, reaching a pressure of 2.4 MPa.

【On-Site Testing】Large Diameter Metal Hose Hydraulic Pressure Testing Site

【On-Site Testing】Large Diameter Metal Hose Hydraulic Pressure Testing Site

Hydraulic Testing Introduction:

Hydraulic testing is a type of permeability test conducted within a borehole. It involves isolating a certain length of the borehole with a plug and then pressurizing water into that borehole segment at a certain pressure, measuring the corresponding inflow rate. The inflow rate per unit length of the test section under a certain pressure is used to characterize the permeability of the rock in that borehole segment, making it a commonly used method for evaluating rock permeability. Pre-test Stage: Gradually raise the water pressure inside the pipeline to the specified test pressure and stabilize it for 30 minutes. If there is a pressure drop during this period, water can be added to re-pressurize, but the re-pressurization must not exceed the test pressure. Inspect the pipeline joints, fittings, and other areas for leaks or damage. If there are leaks or damage, stop the pressure test immediately, identify the cause, and take appropriate measures before retesting. Main Test Stage: Stop adding water and pressurizing, stabilize for 15 minutes. If the pressure drop after 15 minutes does not exceed the allowable pressure drop value, increase the test pressure to the working pressure and maintain it at a constant pressure for 30 minutes. Conduct visual inspection, and if there are no signs of leakage, the hydraulic test is deemed satisfactory.

Previous article:Warm Welcome to CGN and Daya Bay Nuclear Power Plant Leadership for Guidance
Next article:Free Testing Service: Stainless Steel Metal Hose Spectrometer
分享到:

Recommended articles

  • Shoulder the High-Rise Firefighting Mission” – Magirus MAGIRUS Aerial Fire Truck
  • 【On-site Testing】Pressure Testing Scene of Rubber Soft Joint for Fan Coil Threaded Connection, 25kg
  • American Bureau of Shipping (ABS) Certificate
  • Master’s Summary of Installation Precautions for Stainless Steel Bellows Compensators
  • 【Counterfeiting】Hunan Baoteng Weixin Building Materials Co., Ltd. Counterfeit Songjiang Metal Hoses
  • Installation Instructions for SHM Adjustable Damping Spring Isolators
  • Using large-diameter flanges for pressure testing may lead to leakage.
  • Why Indoor Swimming Pools Need Pool-Specific Dehumidification Heat Pumps

Recommended products

  • JS-4-800 Cooling Tower Spring Vibration Isolators

    JS-4-800 Cooling Tower Spring Vibration Isolators

  • 【DIN】DIN65 German Standard Rubber Flexible Joint “DIN2501”

    【DIN】DIN65 German Standard Rubber Flexible Joint “DIN2501”

  • KST-L Type Double Sphere Threaded Rubber Expansion Joint

    KST-L Type Double Sphere Threaded Rubber Expansion Joint

  • 【OEM】DN250 Single Sphere Rubber Expansion Joint OEM Factory “3-Year Warranty”

    【OEM】DN250 Single Sphere Rubber Expansion Joint OEM Factory “3-Year Warranty”

Recommended cases

  • The Rubber Joint Contract for the National Library Project

    The Rubber Joint Contract for the National Library Project

  • Contract for Suspension Spring Vibration Absorbers for Shanghai Metro Line 9 Phase III

    Contract for Suspension Spring Vibration Absorbers for Shanghai Metro Line 9 Phase III

  • Rubber Expansion Joint Contract for Hainan Nuclear Power Project in Changjiang Li Autonomous County

    Rubber Expansion Joint Contract for Hainan Nuclear Power Project in Changjiang Li Autonomous County

  • NG Rubber Compensator for XCMG Group Kaigong Heavy Machinery Shield Machine

    NG Rubber Compensator for XCMG Group Kaigong Heavy Machinery Shield Machine

  • CONTACT
  • HOME
  • CASES
  • EXPANSION JOINT
  • EXPANSION BELLOW
  • VIBRATION ISOLATOR
  • Website registration number:    Your trustworthy partner - Shanghai Songjiang Vibration Absorber Co., Ltd  Copyright     |  Website Map

    • by telephone
    • Customer service WeChat
    • contact information