Songjiang Group
  • Home
  • About Us
  • Expansion Joint
    • Single Sphere Expansion Joint
    • Double Sphere Expansion Joint
  • Expansion Bellow
  • Vibration Isolator
  • Cases
  • News
  • Contact
Installation Instructions for Bellows Compensator “Simple and Practical”

INSTALLATION INSTRUCTIONS VIEWS

Current position: Home > NEWS > INSTALLATION INSTRUCTIONS > text

Installation Instructions for Bellows Compensator “Simple and Practical”

source:Songjiang Group    date:2024-3-28   

The official website of Shanghai Songjiang Vibration Absorber Co., Ltd. presents: Bellows Compensator Installation Instructions “Simple and Practical” Information. Songjiang Group shares installation instructions for bellows compensators in both Chinese and English versions, providing convenience for users to further understand and learn about bellows compensators. Below is a detailed introduction.

Installation Instructions for Bellows Compensator

Fixed Points

An expansion joint acts as a piston due to the forces generated by internal pressure. To prevent damage to the pipes, they must be properly anchored to handle these reaction forces (FR).

The formula for calculating the reaction force of an expansion joint is as follows: Fr = Q x P x 0.01 Fr = reaction force (in kN). Q = effective cross-sectional area (in cm2). P = actual pressure (in bar or kp/cm2).

Installation

Before installation, ensure that the product is used within the allowable temperature, pressure, and displacement ranges!

Expansion joints should be inspected regularly. It is recommended that expansion joints operate in compression rather than tension, and torsion and lateral displacement are not permitted.

Maintenance instructions: observe monthly whether the expansion joint is over-displaced and maintain the expansion joint within its normal length.

To ensure expansion capability, assembly bolts should be kept to a minimum (not exceeding 2 mm or 3 mm of thread depth) to avoid damaging the expansion joint body.

Related Link:DN80 Authentic 304 Corrugated Pipe Compensator

Previous article:【Feeding】Rubber bulk material automatic feeding system "Never make mistakes again"
Next article:Installation Instructions for STR Rubber Vibration Isolators
分享到:

Recommended articles

  • Installation Instructions for SCR Low-Frequency Rubber Vibration Isolators
  • What is a stainless steel braided hose?
  • 【Manufacturer’s Response】Feedback on Rubber Expansion Joints at Changjiang Nuclear Power Station, Hainan
  • Occupational Health and Safety Management System Certification
  • BE Rubber Vibration Isolator Compression Performance Test Report
  • The on-site use of EPDM rubber expansion joints, ‘Staying at our posts’
  • Rubber Expansion Joint Installation Instructions
  • Elevating the image of China’s vibration isolation and noise reduction industry to achieve sustainable development as the industry leader

Recommended products

  • AS Australian Standard Rubber Expansion Joint

    AS Australian Standard Rubber Expansion Joint

  • 【Galvanized】DN250 Single Ball Galvanized Flanged Rubber Expansion Joint

    【Galvanized】DN250 Single Ball Galvanized Flanged Rubber Expansion Joint

  • DN50 Hydraulic Oil Rubber Expansion joint “It’s the hard truth if it lasts for 3 years”

    DN50 Hydraulic Oil Rubber Expansion joint “It’s the hard truth if it lasts for 3 years”

  • DN32 Threaded Rubber Expansion Joint for ‘Hospital Central Air Conditioning Fan Coil Unit

    DN32 Threaded Rubber Expansion Joint for ‘Hospital Central Air Conditioning Fan Coil Unit

Recommended cases

  • “Liaoning Huadian Tieling Power Generation Project” Desulfurization Rubber Expansion Joint Contract

    “Liaoning Huadian Tieling Power Generation Project” Desulfurization Rubber Expansion Joint Contract

  • The Rubber Joint Contract for the Guizhou Tianshengqiao Hydropower Station Project

    The Rubber Joint Contract for the Guizhou Tianshengqiao Hydropower Station Project

  • Contract for Rubber Joints with Zhejiang Changxing Hanergy Thin Film Solar Energy

    Contract for Rubber Joints with Zhejiang Changxing Hanergy Thin Film Solar Energy

  • Contract for Spring Isolators for the Pump Room at Shangri-La Hotel, Fuzhou

    Contract for Spring Isolators for the Pump Room at Shangri-La Hotel, Fuzhou

  • CONTACT
  • HOME
  • CASES
  • EXPANSION JOINT
  • EXPANSION BELLOW
  • VIBRATION ISOLATOR
  • Website registration number:    Your trustworthy partner - Shanghai Songjiang Vibration Absorber Co., Ltd  Copyright     |  Website Map

    • by telephone
    • Customer service WeChat
    • contact information